A made-to-print quotation is tied to a drawing revision. The geometry, the material, the finish, the thread and the quality requirements that are reviewed are those on the revision that was sent, not those on a later file that arrives in a side message, and not those on a model that has no stated relationship to the 2D print. If the revision is not identified, that is the first open item.
SUNHY quotes automotive fasteners and gas-equipment component parts from the current customer drawing. Catalogue type codes and example sizes on this site do not replace the item number or the revision on that drawing. The general RFQ list in what to include in a made-to-print RFQ starts with this point; this note explains what happens when the print changes.
Identify the revision that is to be quoted
The enquiry should carry the item number, the revision index or date, and the file that belongs to it. If several sheets, a specification and a 3D model are supplied, the order of precedence should be clear. A model helps the review of form and tool access; it does not override the 2D drawing unless the enquiry says so in writing.
Where two files disagree — a title-block class of fit against a note, a material on the purchase order against a material on the print, or an old PDF against a newer native file — the conflict is flagged, not guessed. Production does not start from a mixed set of requirements.
A change of revision is a new review
If the drawing changes after a quotation, or after an order is placed, the new revision has to be reviewed. Even a small change — a thread class, a coating note, a radius, a marking, a packing instruction — can affect tools, gauges, heat treatment, coating or documents. The review may confirm that the existing route still applies, or it may require a new quotation, new tools, or a new first-article or layout inspection.
Informal instructions such as “use the new radius but keep the old thread” are not a substitute for a revised print, or for a written deviation that the customer issues. The shop floor does not carry two revisions of the same characteristic at once.
Work in process and already-finished parts
When a revision changes during production, the status of blanks, finished parts, tools and documents has to be agreed. Some lots may be completed to the previous revision if the customer so instructs; others may need to be held, reworked only if the new print allows it, or scrapped. Those decisions are written. They are not taken as a convenience to clear a machine.
Material certificates, inspection records and, where they have been agreed, IMDS or PPAP content have to follow the revision that the parts were actually made to. A certificate issued against an old revision is not relabelled. The note on documents that can be confirmed per order applies here as well.
Prototypes, tools and capability data
Samples, first-article reports and capability data are tied to a revision and to a process condition. They do not automatically cover a later print. If only some characteristics changed, a delta review may be enough; if the change affects form, heat treatment, coating or tooling, a further layout or study may be required. See the notes on first-article inspection and on prototype samples and series production.
A die or fixture cut to an earlier revision may or may not be usable. That is a process and tooling question, not a commercial assumption. The related note on cold-heading tooling covers die changes on headed work.
Specifications, language and the edition that applies
Many prints invoke a customer standard, an ISO or DIN document, or a coating specification. The enquiry should indicate which edition applies if the drawing itself does not. An outdated attachment and a newer title-block reference are a conflict, not a choice for the supplier to make. The same applies when a print exists in more than one language and the notes do not say the same thing: the conflict is flagged, and production does not start from a mixed reading.
Email comments, marked-up screenshots and verbal instructions given during a visit are useful warnings, but they do not replace a revised drawing or a written deviation. If a buyer already knows that a note will change, the clean path is to issue the new revision, or to state that the quotation is indicative until that revision arrives. Quoting two possible states in one price, without a stated revision, is not a reliable basis for tools or for first-article inspection. The same discipline applies when only a 3D model is updated and the 2D drawing is left unchanged: the model still does not override the print unless the enquiry says so in writing.
What to write in the RFQ
State the item number and the revision to be quoted, and send that file, not a mix of files. If a change is already expected, say so. If you are updating an existing order, mark the new revision clearly and say what should happen to work in process. Use the request form or email anna@sunhyings.com.
This article is a capability and commercial note. It is not a certificate, a dimensional data book, or evidence of customer approval. Catalogue type codes and example grades do not replace the customer’s item number, material specification or drawing revision.